Solar PV Planning Drawings & Glint and Glare Reports in Ireland
Council-ready solar planning application drawings, ForgeSolar glint and glare assessments, glare pre-simulation, and landscape plan support for rooftop and ground-mounted solar PV projects across Ireland.
Trusted by Ireland's Leading Solar Businesses



+ many more planning consultants, developers, and EPC contractors across Ireland
Technical Services for Your Solar Pipeline
Specialist reports and design services your business can rely on — prepared to Irish planning authority standard and delivered on your timeline.
Glint & Glare Analysis
Protect neighbours, protect your planning application
Our specialist glint and glare assessments identify and mitigate potential reflectance impacts from solar panels on surrounding properties, roads, and aviation routes — a critical requirement for Irish planning authorities.
PV Planning Drawings
Accurate drawings that satisfy planners first time
Professionally prepared planning drawings for solar PV systems — from small domestic installations to utility-scale solar farms. We produce all required site layout, elevation, and section drawings to Irish planning standards.
Ground-Mounted Solar Design
Field-to-grid solar farm design for Irish conditions
End-to-end design services for ground-mounted solar farms across Ireland, from initial feasibility through to full planning submission. We understand Irish ground conditions, wind loading, and planning policy.
Roof-Mounted Solar Design
Commercial and domestic rooftop solar — designed right
Structural and planning design for commercial rooftop solar installations across Ireland — from single warehouse roofs to portfolio-wide programmes. We ensure your installation is safe, compliant, and planning-approved.
Landscape Plans
Landscape plans that complement your LVIA or arboriculture report
We produce detailed Landscape Plans for solar planning applications in Ireland. Where clients supply an LVIA or arboriculture report, we use those findings to prepare planting schemes and landscape integration drawings that satisfy planning authorities.
Read a Sample Report Before You Commission
No sign-up, no sales call. These are complete, representative documents in the format you would receive — read them in full or save them as PDF.
Glint & Glare Assessment
A full ForgeSolar-based report for a 10MW ground-mounted scheme — methodology, receptor schedule, results table and conclusion.
12 sections · Ground-mounted
Read the samplePV Planning Drawings
The drawing set a local authority expects with a solar application — site location, layout, sections, elevations and details.
Full drawing set · A1 sheets
Read the sampleLandscape Plan
A planning-standard landscape and screening drawing produced from a client LVIA, with planting schedule and mitigation.
Planting schedule · Screening
Read the sampleFree guide: Glint and Glare Assessment Guidance for Irish Planning Applications
When an assessment is required, how the modelling works, how to read the results, and what planning authorities expect in the report. Ungated — no email needed.
The Outsourcing Partner Behind Ireland's Solar Pipeline
We integrate directly into your workflow — extending your capacity, protecting your margins, and delivering technical reports your clients can depend on.
Built for Business Partners
We work exclusively with planning consultants, developers, and solar contractors — not direct consumers. Your business is our business.
Expand Capacity Without Overhead
Add Irish solar planning expertise to your service offering without hiring. We scale with your pipeline, project by project.
Council-Ready Documentation
Our reports are written to satisfy Irish planning authorities at first submission — protecting your reputation and your clients' timelines.
Overnight Turnaround
Our India-based team in Mumbai works while Ireland sleeps. Briefs sent in the afternoon are progressed overnight and ready for your morning review.
White-Label Ready
Our reports are delivered under your brand or as standalone technical documents — seamlessly integrated into your planning submission.
Dedicated Account Management
A named consultant on every project. Direct communication, no account handoffs, and a response within one business day — always.
Integrated Into Your Workflow From Day One
A simple, transparent process designed to fit around your business — not the other way around.
Initial Brief
Send us your project brief — site location, scale, and what reports you need. We turn around a fixed-fee proposal within one business day.
Onboarding & Kick-off
We assign a dedicated consultant to your account. We agree deliverables, timelines, and how you'd like reports branded — your way.
Technical Analysis
Our specialists carry out glint & glare modelling, landscape plan drafting, or PV design — to the standard required by Irish planning authorities.
Draft for Your Review
You receive a draft report to review on behalf of your client. Two revision rounds included. We incorporate all feedback before sign-off.
Final Delivery
Final reports delivered in your preferred format — ready to submit under your brand or as standalone technical appendices.
Ongoing Partnership
We stay available post-submission for further information responses, planning queries, and your next project in the pipeline.
Trusted by Ireland's Solar Sector
From individual farmers to national energy companies — here's what our clients say about working with SolarPlan Ireland.
"SolarPlan Ireland turned around our glint and glare report in three weeks — well ahead of our planning submission deadline. The report answered every query from the council's planning officer and we received permission without needing a further information request."
Ciarán O'Brien
Development Director
Renewable Energy Developer, Leinster
"The Landscape Plan produced for our Tipperary project was exceptionally thorough. Working from our LVIA, the planting scheme and ZTV mapping clearly demonstrated the limited visual impact of the development and convinced an initially skeptical planning authority."
Aoife Murphy
Senior Project Manager
Utilities Contractor, Munster
"As a farmer exploring agri-voltaic options, I needed someone who understood both the agricultural and planning sides. SolarPlan explained everything clearly and their planning drawings were exactly what the council needed."
Seán Gallagher
Farm Owner
Agricultural Landowner, Connacht
Frequently Asked Questions
Quick answers to the questions we hear most often from solar developers and landowners across Ireland.
We work exclusively with businesses — planning consultants, solar developers, EPC contractors, land agents, and energy companies. We do not work directly with end consumers. If you are a business that needs reliable Irish solar planning documentation delivered to your standard and timeline, we are the right partner.
We regularly produce reports that are submitted under our partner's letterhead and brand as part of their planning submission. We can also deliver standalone technical appendices if you prefer. We discuss your preferred format at kick-off and work to it consistently across every project.
Yes — our India-based team is structured to run multiple concurrent projects across different Irish counties and project types. If you have a pipeline of projects, we can agree a framework arrangement and a dedicated team to manage your volume with consistent quality and turnaround.
A glint and glare assessment uses computer modelling to predict whether solar panels will cause problematic reflections affecting neighbouring properties, road users, or aviation. Irish planning authorities routinely request it for ground-mounted solar farms and some commercial rooftop systems. Submitting proactively — rather than in response to a further information request — significantly reduces planning risk for your client.
A Landscape Plan is a planning-standard drawing showing proposed planting, screening, and landscape mitigation measures. We produce it from the LVIA or arboriculture report your specialist or your client's consultant has already prepared — send us those documents and we translate the findings into a clear drawing set accepted by all Irish planning authorities.
Our standard turnaround for a glint and glare assessment is 2–4 weeks from receipt of complete site drawings. Landscape Plans typically take 2–3 weeks. Expedited delivery in 7–10 working days is available for urgent planning deadlines — contact us to discuss your programme.
Yes. We work on projects throughout the Republic of Ireland and Northern Ireland. Our team is trained in both the Republic's planning system (An Bord Pleanála, local authorities) and Northern Ireland's system (Planning Appeals Commission, local councils).
Send us a brief — project location, scale, and what reports you need. We will respond within one business day with a fixed-fee proposal. No lengthy procurement process, no sales calls unless you want one. Most partners are fully onboarded and receiving work within 48 hours of first contact.
Ready to Add Irish Solar Planning Capacity to Your Business?
Partner with our India-based team in Mumbai and deliver more for your clients — without increasing your overheads. Get a tailored proposal within one business day.
Stay Ahead of Irish Solar Planning
Monthly planning insights, policy updates, and technical guidance for solar developers, contractors and planning consultants working in Ireland.
No spam. Unsubscribe anytime. We respect your privacy.